Watch Incremental launching method - ULMA Construction [en] in New Channel | Channify

c-r6sHxW1MaJ5BvZen 4774739 ObvE4J4GOF8
Views —
Likes —
Comments —
Published Jun 25, 2014
Channel ULMA Construction

Add More Videos To your Channel

Bridge construction by incremental launching with ENKOFORM HMK. Each stretch of the bridge deck is manufactured in a fixed pre-fabrication area behind the abutment. Each new stretch is joined to the previously built and pushed by a hydraulic system, so that the bridge deck is sliding on the piers previously built. Subscribe now: http://goo.gl/Qwbp6X http://www.ulmaconstruction.com/en