Watch Incremental launching method - ULMA Construction [en] in New Channel | Channify

c-PUOe7gmyriqhu3KW 2883252 ObvE4J4GOF8
Views
Likes
Comments
Published Jun 25, 2014
Channel ULMA Construction

Add More Videos To your Channel

Bridge construction by incremental launching with ENKOFORM HMK. Each stretch of the bridge deck is manufactured in a fixed pre-fabrication area behind the abutment. Each new stretch is joined to the previously built and pushed by a hydraulic system, so that the bridge deck is sliding on the piers previously built. Subscribe now: http://goo.gl/Qwbp6X http://www.ulmaconstruction.com/en